×

Partner Login

Consultant Login

Borri

  • PARTNER LOGIN
  • GlobalGlobal
    • Italiano Italiano
    • Русский Русский
    • Deutsch Deutsch
  • Applications
    • Critical Power.
      • Computer and Peripheral.
      • Small and Medium data center.
      • Large data center.
      • Networks and Servers.
    • Critical Power.
      • Industrial controls and
        process automation
        .
      • Medical equipment.
      • Building automation.
      • Emergency and safety systems.
    • Industrial Power.
      • Oil & Gas.
      • Power generation
        and water treatment
        .
      • Power transmission & distribution.
      • Marine.
      • Railway.
      • Chemical, Mining and Metallurgy.
      • Process Industry.
    • Renewable Power.
      • Photovoltaic systems.
      • Hybrid energy
        production systems
        .
      • Micro grids.
      • Grid regulation.
  • Products
    • Critical Power:
      • Critical Power 1 Phase
        for ICT
        .
      • Critical Power 3 Phase
        for ICT
        .
      • Critical Power 3 Phase
        for industry and service
        .
      • Data Center solutions.
        • UPSaver 3vo.
    • Industrial Power.
    • Renewable Power.
  • Service
    • Planning, installation, commissioning.
    • Maintenance.
      • Data centers.
      • Critical Power.
      • Industrial Power.
      • Renewable Power.
    • Analytical tests.
    • Battery tests.
    • Repair & spare parts.
    • Training.
    • Remote monitoring.
  • News
  • Download
  • Company
    • Borri 90 years
    • About Us
    • Sustainability
    • Organizational Model and Ethics line
    • Quality & Certifications
    • Careers
  • Contacts
  • Home
  • News
  • Case study
  • Borri secures smooth process in one of the largest hospitals in Varna, Bulgaria

Borri secures smooth process in one of the largest hospitals in Varna, Bulgaria

Borri secures smooth process in one of the largest hospitals in Varna, Bulgaria

by Borri spa / Thursday, 19 September 2024 / Published in Case study
Borri UPS for healthcare applications

As the third-largest city and major seaport in Bulgaria, Varna has a population of around half a million people, which significantly increases during summer season with tourists spending their vacations in the area. To sustain the demand of healthcare services, the region can rely on an extensive network of hospitals, care homes and other medical facilities.

Understanding Healthcare Applications’ Energy Needs

Hospitals are among the most energy-intensive buildings, and healthcare is closely linked to human well-being. These factors are critical in an environment where healthcare facilities are complex and expensive structures with an increasing demand for services. Any downtime in the use of electrical medical equipment and related data systems can cause major consequences to patient’s diagnostics and data records. Spikes, power surges and energy loss can affect the normal functioning of medical equipment or, in worst cases, damage them, with potential disruptions in the patient care and treatment. The use of a UPS to provide emergency short-term power guarantees continuity to healthcare services with no delays for patients. It also reduces any error in report and loss in data.

Powering Varna’s Largest Hospital: a success story

In Varna, Borri has recently provided its power protection solutions to one of the largest hospitals in the city. HI (Heavy Industries) Engineering Ltd., Borri critical power official partner in Bulgaria, followed the project locally.

HI Engineering Ltd. has been managing the hospital’s entire power backup system for many years, including power generators and UPS devices. We successfully integrated six Borri B9000FXS 160 kVA UPS units into the hospital’s power setup. Other devices in the facility include B9000FXS 125 kVA, 160 kVA and 200 kVA to guarantee smooth functioning of the hospital’s equipment.

The hospital is equipped with the most modern digital equipment to track patients’ essential diagnostic and treatment information such as:

  • MRIs scanners
  • CT scanners
  • Robotic surgical systems
  • Modular radiosynthesis systems
  • Medical laboratories
  • Radiation and hadron therapy equipment
  • Ultrasound machines

Thanks to this equipment, the hospital performs a 24/7 range of high technological medical imaging, robotic surgery and treatments.

To ensure these procedures are performed without interruption, the hospital relies on Borri UPS devices to prevent failures and malfunctions of the grid.

Key Features of Borri’s B9000FXS-B9600FXS UPS Systems

Borri critical power solutions are compliant to the strictest safety requirements. Borri on-line double conversion UPS’s guarantee high IP degree levels, transformers/autotransformers for isolation, voltage adjustment and a comprehensive range of monitoring and remote communication options.

B9000FXS-B9600FXS range optimally suits demanding applications such as healthcare:

  • Perfect matching with the upstream network and Diesel Generator, thanks to PF 1 rectifier.
  • Independent sources feeding capability and galvanic separation between DC link and AC output, ensured by Inverter isolation transformer.
  • Designed, engineered and manufactured 100% by Borri, according to all the product international standards, for top performance and resilience.

Discover more about the series at the following link: B9000FXS three-phase UPS for industry and service – Borri

Over a decade of commitment and trust: Borri and HI Engineering Ltd. in Bulgaria

Our special thanks to HI Engineering Ltd team for their professional work and support in the project. At Borri, we and our partners place a special focus on healthcare, continuously developing and improving our efficient and reliably systems to meet the stringent requirements of hospitals and ensure the safety and well-being of patients.

For any information about our solutions for healthcare and other critical power applications in Bulgaria please contact HI Engineering at this link.

For all other countries, drop us an email at info.borri.it@legrand.com, we will address you to your closest Borri Official Partner.

What you can read next

Case study CERN: Borri protects the particle accelerator
Borri 3-phase UPSs Ingenio Plus to Marks & Spencers
Borri delivers 3-phase UPSs to a British multinational retailer
Borri IP54 UPS
Borri for one of the UK’s largest water treatment works

Search

Recent Posts

  • Borri UPS's at High Tech Campus in Villach, Austria

    Borri UPS’s at the High Tech Campus in Villach, Austria

    UPS systems play a crucial role in research and...
  • Hydrogen Eletrolysis DC Rectifiers

    Providing efficient power for middle-market green hydrogen electrolysis

    In a world increasingly conscious of its enviro...
  • UPS and STS redundancy schemes

    How UPS and STS redundancy schemes can increase availability

    Redundancy is the most used and effective way t...
  • UPS for airport applications

    Enhanced safety and efficiency for a major airport in Spain.

    Earlier this year Borri and Sinergia S.L., offi...
  • UPS and generators or a lifetime of friendship

    UPS and generators should be best friends, smoo...

Archives

  • February 2025
  • September 2024
  • June 2024
  • January 2023
  • November 2022
  • April 2022
  • December 2021
  • July 2021
  • March 2021
  • January 2021
  • November 2020
  • May 2020
  • February 2020
  • January 2020
  • October 2019
  • August 2019
  • May 2019
  • November 2018
  • October 2018
  • July 2018
  • February 2018
  • October 2017
  • May 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • September 2015
  • November 2014
  • September 2014
  • April 2014
  • February 2014
  • January 2014

Categories

  • Case study
  • Corporate
  • Events
  • Exhibitions
  • Products

Applications

  • Critical Power UPS for ICT & data center
  • Critical Power UPS for industry & service
  • Industrial Power
  • Renewable Power

Products

  • Critical Power 1 Phase for ICT
  • Critical Power 3 Phase for ICT
  • Critical Power 3 Phase
    for industry and service
  • UPSaver System
  • Industrial Power
  • Renewable Power

Services

  • Planning, installation, commissioning
  • Maintenance
  • Analytical tests
  • Battery tests
  • Repair & spare parts
  • Training
  • Remote monitoring
  • Privacy Policy
  • Cookie Policy
  • GET SOCIAL

Borri S.p.A. • A Sole Shareholder Company • P.IVA 03471720965
R.I. Arezzo e C.F. 10030570153 • R.E.A. Arezzo 135781 • Cap.Soc.Euro 793.341 int.vers.

TOP



Your request could not be saved. Please try again.



Thank you for your request.

Download the Article

Fill in the form and download the Article


We use Sendinblue as our marketing platform. By Clicking below to submit this form, you acknowledge that the information you provided will be transferred to Sendinblue for processing in accordance with their terms of use





La tua richiesta non può essere elaborata, prova di nuovo.



Grazie per il tuo download.

Scarica l’articolo

Compila il form e scarica subito l’articolo


We use Sendinblue as our marketing platform. By Clicking below to submit this form, you acknowledge that the information you provided will be transferred to Sendinblue for processing in accordance with their terms of use