Borri will upgrade the existing systems with the latest drivers and firmware, thus improving the efficiency and reliability of alreadyinstalled systems. During a preliminary inspection, our technicians will check if the UPS's main power components such as input transformers, chokes, IGBTs and switches can be reused.
Following this inspection, we will supply the customer with a tested logic kit, ready to be installed on site by our technicians. After installation, our Service team will test the system and issue a compliance report as well as a test certificate.