×

Partner Login

Consultant Login

Borri

  • PARTNER LOGIN
  • GlobalGlobal
    • Italiano Italiano
    • Русский Русский
    • Deutsch Deutsch
  • Applications
    • Critical Power.
      • Computer and Peripheral.
      • Small and Medium data center.
      • Large data center.
      • Networks and Servers.
    • Critical Power.
      • Industrial controls and
        process automation
        .
      • Medical equipment.
      • Building automation.
      • Emergency and safety systems.
    • Industrial Power.
      • Oil & Gas.
      • Power generation
        and water treatment
        .
      • Power transmission & distribution.
      • Marine.
      • Transportation.
      • Chemical, Mining and Metallurgy.
      • Process Industry.
      • E-Mobility.
    • Renewable Power.
      • Photovoltaic systems.
      • Hybrid energy
        production systems
        .
      • Micro grids.
      • Grid regulation.
  • Products
    • Critical Power:
      • Critical Power 1 Phase
        for ICT
        .
      • Critical Power 3 Phase
        for ICT
        .
      • Critical Power 3 Phase
        for industry and service
        .
      • Data Center solutions.
        • UPSaver/UPSaver 3vo.
        • INGENIO MAX XT.
    • Industrial Power.
    • Renewable Power.
  • Service
    • Planning, installation, commissioning.
    • Maintenance.
      • Data centers.
      • Critical Power.
      • Industrial Power.
      • Renewable Power.
    • Analytical tests.
    • Battery tests.
    • Repair & spare parts.
    • Training.
    • Remote monitoring.
  • News
  • Download
  • Company
    • Borri 90 years
    • About Us
    • Organizational Model and Ethics line
    • Quality & Certifications
    • Careers
  • Contacts
  • Home
  • 2014

Year: 2014

Case study CERN: Borri protects the particle accelerator

Friday, 21 November 2014 by site-admin
Large Hadron Collider (LHC abbreviated) particle accelerator is the largest and most powerful ever built.The accelerator is located in a 100 meters underground tunnel, running 27 km through both French and Swiss territory, is protected by Borri distributed power protection system, with equipment of various sizes that feed, in a redundant configuration.
Read more
  • Published in Case study, Products
No Comments

German and British edition of DatacenterDynamics Converged 2014

Tuesday, 04 November 2014 by site-admin
At the German and British edition of DatacenterDynamics Converged 2014, Borri presents a new and innovative technology to ensure maximum energy savings in data centers.
Read more
  • Published in Events
No Comments

Borri presents innovative solutions at Panduit EMEA Partner Summit 2014

Tuesday, 09 September 2014 by site-admin
From September 15th to 17th, the physical infrastructure community will come together in Rome for the Panduit EMEA Partner Summit 2014 Panduit is a world-class developer and provider of leading-edge solutions that connect, manage and automate the physical infrastructure and has been for over 50 years.
Read more
  • Published in Events
No Comments

Italian edition of Converged DataCenterDynamics

Monday, 14 April 2014 by site-admin
At the Italian edition of Converged DataCenterDynamics, Borri presents a new and innovative technology to ensure maximum energy savings in data centers of the new generation, multi-purpose (IT management and HPC), high reliability (Tier IV) of Eni, the Green Data Center in Ferrera Erbognone (Pavia).
Read more
  • Published in Events
No Comments

Borri sponsors Energy Management Conference 2014 – Rome, 06 March 2014

Thursday, 20 February 2014 by site-admin
With less than a few weeks to go until the start of the 39th Middle East Electricity to be held between 11-13 February in Dubai, preparations are at full swing and on schedule to welcome you to our booth where Borri' s management will be on your disposal for meeting and enquires.
Read more
  • Published in Events
No Comments

Borri at Middle East Electricity 2014 Italian Pavillion Hall 3 Stand D25

Tuesday, 21 January 2014 by site-admin
Borri at Middle East Electricity 2014 Italian Pavillion Hall 3 Stand D25. With less than a few weeks to go until the start of the 39th Middle East Electricity to be held between 11-13 February in Dubai
Read more
  • Published in Events
No Comments

Search

Recent Posts

  • UPS and STS redundancy schemes

    How UPS and STS redundancy schemes can increase availability

    Redundancy is the most used and effective way t...
  • UPS for airport applications

    Enhanced safety and efficiency for a major airport in Spain.

    Earlier this year Borri and Sinergia S.L., offi...
  • UPS and generators or a lifetime of friendship

    UPS and generators should be best friends, smoo...
  • Peak Shaving UPS and smart grids

    Peak shaving and smart grids: the new frontier of UPS systems

    The way we use UPS systems today has changed a ...
  • OTC 2021 - Borri Stand 2541, Italian Pavilion

    Borri at OTC 2021, Houston, USA

    Visit us at OTC 2021, Italian Pavilion. Borri c...

Archives

  • January 2023
  • November 2022
  • April 2022
  • December 2021
  • July 2021
  • March 2021
  • January 2021
  • November 2020
  • May 2020
  • February 2020
  • January 2020
  • October 2019
  • August 2019
  • May 2019
  • November 2018
  • October 2018
  • July 2018
  • February 2018
  • October 2017
  • May 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • September 2015
  • November 2014
  • September 2014
  • April 2014
  • February 2014
  • January 2014

Categories

  • Case study
  • Corporate
  • Events
  • Exhibitions
  • Products

Applications

  • Critical Power UPS for ICT & data center
  • Critical Power UPS for industry & service
  • Industrial Power
  • Renewable Power

Products

  • Critical Power 1 Phase for ICT
  • Critical Power 3 Phase for ICT
  • Critical Power 3 Phase
    for industry and service
  • UPSaver System
  • Industrial Power
  • Renewable Power

Services

  • Planning, installation, commissioning
  • Maintenance
  • Analytical tests
  • Battery tests
  • Repair & spare parts
  • Training
  • Remote monitoring
  • Privacy Policy
  • Cookie Policy
  • GET SOCIAL

Borri S.p.A. • A Sole Shareholder Company • P.IVA 03471720965
R.I. Arezzo e C.F. 10030570153 • R.E.A. Arezzo 135781 • Cap.Soc.Euro 793.341 int.vers.

TOP



La tua richiesta non può essere elaborata, prova di nuovo.



Grazie per il tuo download.

Scarica l’articolo

Compila il form e scarica subito l’articolo


We use Sendinblue as our marketing platform. By Clicking below to submit this form, you acknowledge that the information you provided will be transferred to Sendinblue for processing in accordance with their terms of use





Your request could not be saved. Please try again.



Thank you for your request.

Download the Article

Fill in the form and download the Article


We use Sendinblue as our marketing platform. By Clicking below to submit this form, you acknowledge that the information you provided will be transferred to Sendinblue for processing in accordance with their terms of use