×

Partner Login

Consultant Login

Borri

  • NEWSLETTER
  • PARTNER LOGIN
  • GlobalGlobal
    • Italiano Italiano
    • Русский Русский
    • Deutsch Deutsch
  • Applications
    • Critical Power.
      • Computer and Peripheral.
      • Small and Medium data center.
      • Large data center.
      • Networks and Servers.
    • Critical Power.
      • Industrial controls and
        process automation
        .
      • Medical equipment.
      • Building automation.
      • Emergency and safety systems.
    • Industrial Power.
      • Oil & Gas.
      • Power generation
        and water treatment
        .
      • Power transmission & distribution.
      • Marine.
      • Transportation.
      • Chemical, Mining and Metallurgy.
      • Process Industry.
      • E-Mobility.
    • Renewable Power.
      • Photovoltaic systems.
      • Hybrid energy
        production systems
        .
      • Micro grids.
      • Grid regulation.
  • Products
    • Critical Power:
      • Critical Power 1 Phase
        for ICT
        .
      • Critical Power 3 Phase
        for ICT
        .
      • Critical Power 3 Phase
        for industry and service
        .
      • Data Center solutions.
        • UPSaver/UPSaver 3vo.
        • INGENIO MAX XT.
    • Industrial Power.
    • Renewable Power.
  • Service
    • Planning, installation, commissioning.
    • Maintenance.
      • Data centers.
      • Critical Power.
      • Industrial Power.
      • Renewable Power.
    • Analytical tests.
    • Battery tests.
    • Repair & spare parts.
    • Training.
    • Remote monitoring.
  • News
  • Download
  • Company
    • About Us
    • Organizational, Management and Control Model
    • Quality & Certifications
    • Careers
  • Contacts
  • Home
  • News
  • Case study
  • Case study CERN: Borri protects the particle accelerator

Case study CERN: Borri protects the particle accelerator

Case study CERN: Borri protects the particle accelerator

by site-admin / Friday, 21 November 2014 / Published in Case study, Products

At the end of September 2014 200 UPS (DC and AC systems with backup batteries) were installed, together, in various areas of the particle accelerator ring, replacing the previous UPS systems. Borri UPS protect emergency auxiliary systems, air conditioning and all critical systems required for controlled shutdown of the accelerator, in addition they protect two data centers dedicated to Atlas and LHC projects.

The supply also includes all maintenance service with a 4 hours mean time to repair on routine or emergency maintenance, as required by CERN requirements. The complex supply for CERN demonstrates the ability of Borri to meet the needs of an industry that requires high-tech customised solutions for applications with very high reliability.

For more information please see CERN case study brochure and news on CERN web site

What you can read next

Battery sizing Borri UPS
Battery sizing for Borri Critical Power UPS
Borri AC-DC UPS's Doha Metro
Borri UPS’s and battery chargers for the Doha Metro
Borri sponsors Energy Management Conference 2014 – Rome, 06 March 2014

Search

Recent Posts

  • The difference between a CPSS and UPS

    Difference between a CPSS and a UPS

    CPSS and UPS’s A central power supply system (C...
  • STS essentials for data centre applications

    STS in data centres

    STS essentials A Static Transfer Switch, or STS...
  • Battery sizing Borri UPS

    Battery sizing for Borri Critical Power UPS

    Besides protecting loads from mains disturbance...
  • FAT Borri Live Streaming

    Factory Acceptance Testing by Borri Live Streaming

    Ensure control and continuity to your projects....
  • Borri AC-DC UPS's Doha Metro

    Borri UPS’s and battery chargers for the Doha Metro

    Borri supplied more than 300 AC and DC UPSs and...

Archives

  • March 2021
  • January 2021
  • November 2020
  • May 2020
  • February 2020
  • January 2020
  • October 2019
  • August 2019
  • May 2019
  • November 2018
  • October 2018
  • July 2018
  • February 2018
  • October 2017
  • May 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • September 2015
  • November 2014
  • September 2014
  • April 2014
  • February 2014
  • January 2014

Categories

  • Case study
  • Corporate
  • Events
  • Exhibitions
  • Products

Applications

  • Critical Power UPS for ICT & data center
  • Critical Power UPS for industry & service
  • Industrial Power
  • Renewable Power

Products

  • Critical Power 1 Phase for ICT
  • Critical Power 3 Phase for ICT
  • Critical Power 3 Phase
    for industry and service
  • UPSaver System
  • Industrial Power
  • Renewable Power

Service

  • Planning, installation, commissioning
  • Maintenance
  • Analytical tests
  • Battery tests
  • Repair & spare parts
  • Training
  • Remote monitoring

BORRI

  • About Us
  • News
  • Contacts
  • Download Brochures & Catalogues
  • Quality & Certifications
  • Newsletter
  • Privacy Policy
  • Cookie Policy
  • GET SOCIAL

© 2020 Borri S.p.A • P.IVA 03471720965
R.I. Arezzo e C.F. 10030570153 • R.E.A. Arezzo 135781 • Cap.Soc.Euro 793.341 int.vers.

TOP });