STS in data centres
Donnerstag, 28 Januar 2021
von Borri spa
STS essentials A Static Transfer Switch, or STS as it is commonly referred to, can be defined as an AC/AC solid-state converter. It supplies the output with one of two input lines where the AC/AC conversion is performed by a pair of Silicon Controlled Rectifiers (or SCRs). Functionally an STS implements a Single Pole Dual
- Veröffentlicht in Products
No Comments
Battery sizing for Borri Critical Power UPS
Donnerstag, 26 November 2020
von Borri spa
Besides protecting loads from mains disturbances, like surges, swells and harmonics, primary UPS goal is to seamlessly deliver power during a prolonged mains fault. Battery packs are put in place in order to meet the required back up time and regardless of technology and chemistry they are usually the most expensive part of the whole
- Veröffentlicht in Products
Factory Acceptance Testing by Borri Live Streaming
Montag, 04 Mai 2020
von Borri spa
Ensure control and continuity to your projects. Borri has developed a Factory Acceptance Testing (FAT) Live Streaming facility for customers to still be able to perform and witness FAT on their equipment, without travelling to the Borri factory. Customers can control their project and meet their project contractual obligations, witnessing the FAT from almost anywhere
- Veröffentlicht in Corporate
Borri UPS’s and battery chargers for the Doha Metro
Mittwoch, 12 Februar 2020
von Borri spa
Borri supplied more than 300 AC and DC UPSs and batteries, powering safety, emergency systems and operations. The systems power the line signalisation, emergency lighting and fire system, substation protection and other critical loads needed to insure safe and proper operations under any power conditions. Doha Metro is one of the most prominent and visible
- Veröffentlicht in Case study
SAVE THE DATE! Borri at Data Centre World 2020 London
Montag, 10 Februar 2020
von Borri spa
Discover Borri data centre solutions at DCWL 2020. Meet us at Stand D420, 11-12 March 2020. The data centre market has been under increasing pressure to achieve lower Total Cost of Ownership (TCO). Therefore, critical equipment such as UPS have come under the spotlight. As one of the leading worldwide manufacturer of UPS systems, Borri
- Veröffentlicht in Events, Exhibitions
UPSaver 3vo, modular UPS for large data centres
Samstag, 14 Dezember 2019
von Borri spa
Modular Hi-Power UPS for large data centres. The new generation UPSaver 3vo is a Modular Hi-Power UPS providing the highest overall reliability and availability of any technology in the market. It is designed to adapt to the critical and changing data centre demands. With state-of-the-art components and design we have produced one of the most
- Veröffentlicht in Products
SAVE THE DATE! Borri at Data Centre World Frankfurt 2019
Montag, 14 Oktober 2019
von Borri spa
Discover Borri data centre solutions at DCWF 2019. Meet us at Stand 425, 13-14 November 2019. From edge to hyperscale data centres, the need for more efficient and cost-effective solutions is increasing. More and more companies are, in fact, adopting cloud solutions or modernizing their infrastructure. At Data Centre World Frankfurt we’ll show you our
- Veröffentlicht in Exhibitions
Modular UPS UPSaver for the Medical University in Gdańsk, Poland.
Montag, 26 August 2019
von Borri spa
Borri UPS systems now protect the MUG data centre and other loads. The Medical University of Gdańsk (MUG) is the largest medical university in northern Poland. The MUG educates more than 6000 undergraduate and postgraduate students at 4 Faculties. INVENTPOWER, Borri official partner in Poland, has supplied and commissioned 4 uninterruptible power systems for the
- Veröffentlicht in Case study
INGENIO MAX XT, scalable UPS for data centres
Freitag, 10 Mai 2019
von Borri spa
Scalable Hi-power UPS up to 2.1 MW for data centres. INGENIO MAX XT provides scalable uninterruptible power systems from 900 kW up to 2.1 MW designed to meet the demanding and changing needs of data centres. High efficiency and reliability combined with flexible configuration make it an optimal solution to your data centre power protection.
- Veröffentlicht in Products
Borri for one of the UK’s largest water treatment works
Samstag, 10 November 2018
von Borri spa
18 Borri custom-built 100 kW IP54 UPS units supplied, installed and commissioned. Borri has recently worked with Power Control, Borri UK official partner for 3-phase UPSs, on a major project for one of the country’s largest water treatment works. Positioned as standalone units, the UPS systems are now providing essential emergency backup power across the
- Veröffentlicht in Case study