×

Partner Login

Consultant Login

Borri

  • PARTNER LOGIN
  • DeutschDeutsch
    • Global Global
    • Italiano Italiano
    • Русский Русский
  • Anwendungen
    • Critical Power.
      • Rechner und Peripheriegeräte.
      • Kleine und
        mittlere Rechenzentren
        .
      • Groß-Rechenzentren.
      • Netzwerke und Server.
    • Critical Power.
      • Industriesteuerungen und Prozessautomatisierung.
      • Medizingeräte.
      • Gebäudeautomation.
      • Notfall- und Sicherheitssysteme.
    • Industrial Power.
      • Öl und Gas.
      • Energieerzeugung und Wasseraufbereitung.
      • Energieübertragung
        und -verteilung
        .
      • Marine.
      • Bahnwesen.
      • Chemie, Bergbau und Metallverarbeitung.
      • Verarbeitende Industrie.
    • Renewable Power.
      • Photovoltaikanlagen.
      • Hybride Energieerzeugungs systeme.
      • Micro grids.
      • Netzregulierung.
  • Produkte
    • Critical Power:
      • Critical Power 1-phasig für IT.
      • Critical Power 3-phasig für IT.
      • Critical Power 3-phasig für Industrie & Service.
      • Rechenzentren.
        • UPSaver 3vo.
    • Industrial Power.
    • Renewable Power.
  • Service
    • Planung, Installation, Inbetriebnahme.
    • Instandhaltung.
      • Rechenzentren.
      • Critical Power.
      • Industrial Power.
      • Renewable Power.
    • Analytische Tests.
    • Batterietests.
    • Reparaturen und Ersatzteile.
    • Training.
    • Fernüberwachung.
  • Nachrichten
  • Download
  • Unternehmen
    • Borri 90 years
    • Über uns
    • Sustainability
    • Quality & Certifications
  • Kontakt
  • Home
  • Nachrichten
  • Products
  • Battery sizing for Borri Critical Power UPS

Battery sizing for Borri Critical Power UPS

Battery sizing for Borri Critical Power UPS

von Borri spa / Donnerstag, 26 November 2020 / Veröffentlicht in Products
Battery sizing Borri UPS

Besides protecting loads from mains disturbances, like surges, swells and harmonics, primary UPS goal is to seamlessly deliver power during a prolonged mains fault. Battery packs are put in place in order to meet the required back up time and regardless of technology and chemistry they are usually the most expensive part of the whole UPS system. A deep understanding on which UPS parameters are involved in assessing the required battery power is paramount to perform accurate sizings, which in turn can allow for considerable savings.

Real power and backup time.

A UPS can be defined as a static electronic converter, which purpose is to deliver real power to the loads. Double conversion UPS’s are based on a dual stage conversion. A first stage – rectifier or AC/DC converter –drawing power from the mains and delivering it to the DC link, which is connected to the battery system. A second stage – inverter or DC/AC converter – which uses DC power to generate clean AC power for the connected loads. In both conversion stages a little amount of power is turned into heat inside both converters. This is usually referred to as rectifier and inverter “losses”. As far as battery operation is concerned, inverter losses should be accounted for in the deliverable battery power to meet the required backup time. This can be accomplished by dividing the required load power by the inverter efficiency factor. Thus adding on top of the count all the power that will be lost in the DC/AC converter throughout the discharge process.

Preventing battery blocks’ damages.

Battery blocks can be defined as chemical energy storage systems. They are usually charged up to their maximum energy capacity, they are combined in a matrix of strings and parallels, to build up the required DC voltage and energy amount to be discharged upon mains failures. During discharge, power is transferred from battery to loads, resulting in a decrease of the blocks voltage. This process must stop before the absolute maximum end of discharge voltage is reached, to prevent blocks’ severe damage.  The end of discharge voltage range defines the so-called DoD (Depth of Discharge), or the extent to which a battery is discharged. Due to the chemical form of the energy storage, available discharge power is a non-linear function of discharge time duration and end of discharge voltage.

The longer the discharge, the smaller the available power is. The lower the end of voltage, the bigger the deliverable power is. Such relationship is charted in typical battery discharge tables, where battery manufacturers state the deliverable power for the allowed backup times and end of discharge voltage range. On the other hand, UPS manufacturers state the minimum DC voltage their inverter can operate at. This figure should match the selected battery end of discharge voltage, sometimes referred to as inverter cut-off voltage, allowing battery solutions to be properly sized.

Battery recharging and UPS sizing.

After a discharge, batteries are to be restored to their nominal capacity through a charging cycle performed by UPS AC/DC converters. The time it takes to fully restore battery capacity is related to the applied charging current. As far as VRLA batteries are concerned, typical required charging current for restoring full capacity within 8 hours is 0.1C, where C is the total battery capacity in Ampere-hours. In UPS systems rectifiers must be able to supply their nominal output power, while charging the connected battery. If the above typical charging time is to be met, the rectifier available charging current of the selected UPS must be equal or exceed the battery’s 0.1C figure. If not the case, an appropriate UPS oversizing is to be applied. Some UPS manufacturers have developed a dedicated feature to allow rectifiers diverting any unused output power to battery charging, thus limiting the need for oversized units.

For more information on sizing a Borri UPS please email us at info@borri.it.

What you can read next

STS essentials for data centre applications
STS in data centres
UPSaver 3vo, modular UPS for large data centres
The difference between a CPSS and UPS
Difference between a CPSS and a UPS

Search

Recent Posts

  • Borri UPSs at High Tech Campus in Villach, Austria

    Borri UPS’s at the High Tech Campus in Villach, Austria

    UPS systems play a crucial role in research and...
  • Borri UPS for healthcare applications

    Borri secures smooth process in one of the largest hospitals in Varna, Bulgaria

    As the third-largest city and major seaport in ...
  • UPS and STS redundancy schemes

    How UPS and STS redundancy schemes can increase availability

    Redundancy is the most used and effective way t...
  • UPS for airport applications

    Enhanced safety and efficiency for a major airport in Spain.

    Earlier this year Borri and Sinergia S.L., offi...
  • UPS and generators or a lifetime of friendship

    UPS and generators should be best friends, smoo...

Archives

  • Februar 2025
  • September 2024
  • Januar 2023
  • November 2022
  • April 2022
  • Dezember 2021
  • März 2021
  • Januar 2021
  • November 2020
  • Mai 2020
  • Februar 2020
  • Dezember 2019
  • Oktober 2019
  • August 2019
  • Mai 2019
  • November 2018
  • Oktober 2018
  • Juli 2018

Categories

  • Case study
  • Corporate
  • Events
  • Exhibitions
  • Products
  • Unkategorisiert

Anwendungen

  • Critical Power-USVs für IT und Rechenzentrum
  • Critical Power-USVs für Industrie und Service
  • Industrial Power
  • Renewable Power

Produkte

  • Critical Power 1-phasig für IT
  • Critical Power 3-phasig für IT
  • Critical Power 3-phasig für Industrie & Service
  • UPSaver/UPSaver 3vo
  • Industrial Power
  • Renewable Power

Dienstleistungen

  • Fernüberwachung
  • Training
  • Reparaturen und Ersatzteile
  • Batterietests
  • Analytische Tests
  • Instandhaltung
  • Planung, Installation, Inbetriebnahme
  • Privacy Policy
  • Cookie Policy
  • SOZIALE NETZWERKE

Borri S.p.A. • A Sole Shareholder Company • P.IVA 03471720965
R.I. Arezzo e C.F. 10030570153 • R.E.A. Arezzo 135781 • Cap.Soc.Euro 793.341 int.vers.

OBEN