{"id":5296,"date":"2018-11-10T11:44:20","date_gmt":"2018-11-10T10:44:20","guid":{"rendered":"https:\/\/www.borri.it\/ip54-ups-water-treatment-works\/"},"modified":"2019-06-14T17:09:30","modified_gmt":"2019-06-14T15:09:30","slug":"ip54-ups-water-treatment-works","status":"publish","type":"post","link":"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/","title":{"rendered":"Borri for one of the UK\u2019s largest water treatment works"},"content":{"rendered":"<h2>18 Borri custom-built 100 kW IP54 UPS units supplied, installed and commissioned.<\/h2>\n<p>Borri has recently worked with Power Control, Borri UK official partner for 3-phase UPSs, on a major project for one of the country\u2019s largest water treatment works.<\/p>\n<p>Positioned as standalone units, the UPS systems are now providing essential emergency backup power across the entire water treatment site. One of the key prerequisites was to have an IP54 rated solution (protected from water and dust particles), with a sizeably reduced footprint. Rather than issuing a standard IT grade UPS within an IP54-rated box, Borri has designed and manufactureed a far more compact IP54 UPS.<\/p>\n<p>The modified units are now 800W x 800D x 2000H and are all front access for easy access and maintenance. The air inlet and outlet fans are also on the front meaning the UPS systems for positioning against a wall. This also contributes to space saving. The battery boxes also provides IP 54 with built in DC isolator and housed in a matching 800W x 800D x 2000H front access box. In addition customized IP54 enclosures contains the bypass switches.<\/p>\n<h3>The success of a close working relationship.<\/h3>\n<p>Power Control\u2019s divisional sales director, Matt de Frece, commented on the project: \u201c<em>We have worked in partnership with Borri for almost a decade on developing bespoke power protection solutions. Power Control was confident that Borri would provide customised UPS systems IP54 rated and significantly reduced in size.<\/em>\u201d<\/p>\n<p>\u201c<em>Borri has an impressive research and development team. We have worked in close collaboration with them on a number of high profile custom installs. Power Control has direct access to the factory and witness testing facility at Borri premises. We can therefore deliver a service that is wholly indicative of Borri reliability. It is our close working relationship that enables us to provide our client with tailored solutions designed to meet their requirements.<\/em>\u201d<\/p>\n<p>Borri\u2019s CTO Enrico Simoni concluded: \u201c<em>The tailor approach has always been a globally renowned Borri key differentiator. This project confirms Borri ability and expertise to meet custom demand for specialist industry sectors. Above all\u00a0<a href=\"https:\/\/www.borri.it\/ru\/industrial-power\/\" target=\"_blank\" rel=\"noopener\">utilities<\/a>, <a href=\"https:\/\/www.borri.it\/ru\/industrial-power\/\" target=\"_blank\" rel=\"noopener\">oil and gas<\/a> and <a href=\"https:\/\/www.borri.it\/ru\/critical-power-pi\/\" target=\"_blank\" rel=\"noopener\">process automation<\/a>.<\/em>\u201d<\/p>\n<p>\u201c<em>Borri invests over 5% of its turnover in research and development to continually provide the best power backup solutions. Borri today&#8217;s offering can rely on more efficient, more resilient and more flexible technologies.<\/em>\u201d<\/p>\n<p>For any further information about Borri 3-phase UPS official partner in the UK \u2013 Power Control Ltd please visit:<br \/>\n<a href=\"https:\/\/powercontrol.co.uk\/\">https:\/\/powercontrol.co.uk<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>18 Borri custom-built 100 kW IP54 UPS units supplied, installed and commissioned. Borri has recently worked with Power Control, Borri UK official partner for 3-phase UPSs, on a major project for one of the country\u2019s largest water treatment works. Positioned as standalone units, the UPS systems are now providing essential emergency backup power across the<\/p>\n","protected":false},"author":2,"featured_media":4570,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[189],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v21.9 (Yoast SEO v21.9.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>IP54 UPS tailored solution for a water treatment works - Borri<\/title>\n<meta name=\"description\" content=\"Borri and Power Control worked for one of the UK\u2019s largest water treatment works. 18 custom-built 100 kW IP54 UPS supplied, installed and commissioned.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/\" \/>\n<meta property=\"og:locale\" content=\"ru_RU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Borri for one of the UK\u2019s largest water treatment works\" \/>\n<meta property=\"og:description\" content=\"Borri and Power Control worked for one of the UK\u2019s largest water treatment works. 18 custom-built 100 kW IP54 UPS supplied, installed and commissioned.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/\" \/>\n<meta property=\"og:site_name\" content=\"Borri\" \/>\n<meta property=\"article:published_time\" content=\"2018-11-10T10:44:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-06-14T15:09:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.borri.it\/wp-content\/uploads\/2018\/07\/Borri_IP54_UPS_water_treatment_works.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Borri spa\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c\" \/>\n\t<meta name=\"twitter:data1\" content=\"Borri spa\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 \u043c\u0438\u043d\u0443\u0442\u044b\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/\",\"url\":\"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/\",\"name\":\"IP54 UPS tailored solution for a water treatment works - Borri\",\"isPartOf\":{\"@id\":\"https:\/\/www.borri.it\/#website\"},\"datePublished\":\"2018-11-10T10:44:20+00:00\",\"dateModified\":\"2019-06-14T15:09:30+00:00\",\"author\":{\"@id\":\"https:\/\/www.borri.it\/#\/schema\/person\/f9fff6aaa006f089e7dba66b497b572a\"},\"description\":\"Borri and Power Control worked for one of the UK\u2019s largest water treatment works. 18 custom-built 100 kW IP54 UPS supplied, installed and commissioned.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/#breadcrumb\"},\"inLanguage\":\"ru-RU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.borri.it\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Borri for one of the UK\u2019s largest water treatment works\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.borri.it\/#website\",\"url\":\"https:\/\/www.borri.it\/\",\"name\":\"Borri\",\"description\":\"Soluzioni UPS per la protezione dell\u2019alimentazione\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.borri.it\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"ru-RU\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.borri.it\/#\/schema\/person\/f9fff6aaa006f089e7dba66b497b572a\",\"name\":\"Borri spa\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ru-RU\",\"@id\":\"https:\/\/www.borri.it\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3b8705bc98d6b86e30d83de14cc15f52?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3b8705bc98d6b86e30d83de14cc15f52?s=96&d=mm&r=g\",\"caption\":\"Borri spa\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"IP54 UPS tailored solution for a water treatment works - Borri","description":"Borri and Power Control worked for one of the UK\u2019s largest water treatment works. 18 custom-built 100 kW IP54 UPS supplied, installed and commissioned.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/","og_locale":"ru_RU","og_type":"article","og_title":"Borri for one of the UK\u2019s largest water treatment works","og_description":"Borri and Power Control worked for one of the UK\u2019s largest water treatment works. 18 custom-built 100 kW IP54 UPS supplied, installed and commissioned.","og_url":"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/","og_site_name":"Borri","article_published_time":"2018-11-10T10:44:20+00:00","article_modified_time":"2019-06-14T15:09:30+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/www.borri.it\/wp-content\/uploads\/2018\/07\/Borri_IP54_UPS_water_treatment_works.jpg","type":"image\/jpeg"}],"author":"Borri spa","twitter_card":"summary_large_image","twitter_misc":{"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u0440\u043e\u043c":"Borri spa","\u041f\u0440\u0438\u043c\u0435\u0440\u043d\u043e\u0435 \u0432\u0440\u0435\u043c\u044f \u0434\u043b\u044f \u0447\u0442\u0435\u043d\u0438\u044f":"2 \u043c\u0438\u043d\u0443\u0442\u044b"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/","url":"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/","name":"IP54 UPS tailored solution for a water treatment works - Borri","isPartOf":{"@id":"https:\/\/www.borri.it\/#website"},"datePublished":"2018-11-10T10:44:20+00:00","dateModified":"2019-06-14T15:09:30+00:00","author":{"@id":"https:\/\/www.borri.it\/#\/schema\/person\/f9fff6aaa006f089e7dba66b497b572a"},"description":"Borri and Power Control worked for one of the UK\u2019s largest water treatment works. 18 custom-built 100 kW IP54 UPS supplied, installed and commissioned.","breadcrumb":{"@id":"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/#breadcrumb"},"inLanguage":"ru-RU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.borri.it\/ru\/ip54-ups-water-treatment-works\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.borri.it\/"},{"@type":"ListItem","position":2,"name":"Borri for one of the UK\u2019s largest water treatment works"}]},{"@type":"WebSite","@id":"https:\/\/www.borri.it\/#website","url":"https:\/\/www.borri.it\/","name":"Borri","description":"Soluzioni UPS per la protezione dell\u2019alimentazione","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.borri.it\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"ru-RU"},{"@type":"Person","@id":"https:\/\/www.borri.it\/#\/schema\/person\/f9fff6aaa006f089e7dba66b497b572a","name":"Borri spa","image":{"@type":"ImageObject","inLanguage":"ru-RU","@id":"https:\/\/www.borri.it\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3b8705bc98d6b86e30d83de14cc15f52?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3b8705bc98d6b86e30d83de14cc15f52?s=96&d=mm&r=g","caption":"Borri spa"}}]}},"_links":{"self":[{"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/posts\/5296"}],"collection":[{"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/comments?post=5296"}],"version-history":[{"count":4,"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/posts\/5296\/revisions"}],"predecessor-version":[{"id":6848,"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/posts\/5296\/revisions\/6848"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/media\/4570"}],"wp:attachment":[{"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/media?parent=5296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/categories?post=5296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.borri.it\/ru\/wp-json\/wp\/v2\/tags?post=5296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}